Latest Issue
 
Windtech International September October 2024 issue

 

FOLLOW US AT

follow

 

follow


TÜV SÜD has announced that it has won the contract for wind condition analysis and annual energy production (AEP) assessment services for the next phase of an offshore wind farm project off the south-west coast of South Korea, developed by Korea Offshore Wind Power Corp.
 
The second stage of the project will have a capacity of 400 MW. Data is collected around the wind farm site over a period of at least one year. The results of this analysis are used to evaluate whether the designs of the wind turbines, sub-structures and other structures to be installed at the wind farm are suitable for the specific conditions at the site. For the AEP assessment, TÜV SÜD will use the analysed wind condition data to evaluate the layout of the wind farm and its estimated annual energy production during operation.
 
Use of cookies

Windtech International wants to make your visit to our website as pleasant as possible. That is why we place cookies on your computer that remember your preferences. With anonymous information about your site use you also help us to improve the website. Of course we will ask for your permission first. Click Accept to use all functions of the Windtech International website.