Adani New Industries (ANIL) has started production of 91.2-metre onshore wind turbine blades at its integrated manufacturing facility in Mundra, Gujarat, India. The company has also secured certification for its MWL185-5.0 MW wind turbine platform.
The blades have been developed for the MWL185-5.0 MW platform, which features a rotor diameter of 185 metres and a hub height of 140 metres.
WindGuard Certification certified the platform following prototype testing at the Mundra facility. Developed in partnership with German technology company W2E (Wind to Energy), the platform has been certified for conformity with the IEC 61400 series of standards covering wind turbine design, testing and manufacturing.




