Cadeler has announced the signing of firm contracts with ScottishPower Renewables for the East Anglia Two Offshore Wind Farm. Cadeler will be responsible for the transportation and installation of both the foundations and the WTGs for East Anglia Two.
The project will utilise one of Cadeler’s A-class newbuild vessels, along with an O-class vessel from Cadeler’s existing fleet. Offshore works are set to commence in 2027. East Anglia Two will be located in the southern region of the North Sea, off the east coast of England, and is expected to feature 64 turbines of 15 MW each, with a total capacity of 960 MW.