Cadeler has announced the signage of three agreements with ScottishPower Renewables, a company part of the Iberdrola Group.
The Vessel Reservation Agreement is for the transport and installation of 95 wind turbine generators (WTGs), which are set to be installed during 2026 in the North Sea. The wind farm will have a total capacity of 1.4GW. Additionally, two Preferred Bidder Agreements have been signed covering the East Anglia One North and East Anglia Two. The total value of these agreements ranges from € 90 to € 225 million.