FairWind has a won a contract by Bladt Industries to install the electrical scope on 135 Transition Pieces for the Hornsea Two offshore wind farm located in the UK.
The scope of the work performed by FairWind is full electrical installation, including light study design of cable support system, and installing all components including free issued items from the end-client. The Transition Pieces will be fabricated by Bladt Industries in Aalborg, Denmark. Located 89 kilometer off the Yorkshire coast in the North Sea Hornsea Two is owned by Ørsted and will have a capacity of 1.4GW.