Jan De Nul has signed a contract with Synera Renewable Energy (SRE) for the installation of export cables at the Formosa 4 offshore wind farm in Taiwan. The company will transport, install, and protect around 60 kilometres of subsea high-voltage alternating current (HVAC) cables to bring electricity ashore.
The Formosa 4 wind farm is located about 20 kilometres off the coast of Miaoli County and will comprise 35 turbines with a total capacity of 495 MW. Offshore construction work is scheduled to begin in 2026 and continue into 2027. Jan De Nul will use its cable-laying vessel Willem de Vlamingh for the project.