Gemini Wind Park, one of the largest offshore wind parks in the Netherlands, is once again fully operational after a failure in one of the export cables between the wind park and the shore.
A group of cable and energy specialists, including a repair team from NKT, assisted with a repair over the summer. The wind farm experienced a cable failure in one of the export cables between the wind park and the shore. A repair team was assembled, and the NKT team led the jointing of the replacement cable between the wind farm and the Groningen coast.
Image: courtesy NKT