With their joint venture Ecowende, Shell and Eneco have won the tender for the construction of an offshore wind farm at Hollandse Kust (west) lot VI.
Ecowende will build a wind farm that will have a minimal impact on nature. The project will be located some 53 kilometres from the Dutch coast, off IJmuiden. The wind farm has an installed capacity of about 760 MW. Shell and Eneco have already taken the final investment decision for this wind farm. Ecowende plans to commission the Hollandse Kust (west) VI offshore wind farm in 2026.