Siemens Gamesa is set to supply 39 of its SG 5.8-170 turbines to two sites totalling 242MW in Sweden dubbed the ‘Twin Peaks’. The turbines will be split between 25 at the Ranasjö site and 14 at the Salsjö location, both around 15km apart in central Sweden.
They are due to be commissioned by the first quarter of 2024 and will be covered by a service agreement of 30 years. The turbines will be delivered to the Swedish developer Arise and have a nominal capacity of 6.2 MW each. The deal is financed by The Renewables Infrastructure Group (TRIG) and InfraRed’s European Infrastructure Income Fund 4.