Tekmar Energy (Tekmar) has been awarded a contract by VBMS to supply its TekLink cable protection systems (CPS), bellmouths, cover disks and hang-offs on Blyth Offshore Windfarm.
It is the world’s first 66kV offshore wind farm and is wholly owned by EDF Energies Nouvelles and is being built by EDF Energy Renewables. Nexans will supply the cable which will be installed along with the CPS by VBMS in the summer of 2017.