ABO Wind’s first Polish project will be constructed in 2021 and will consist of 9 Siemens Gamesa SG114 turbines with a total output of 19.8MW.
The Donaborów wind farm is located about 90 kilometres northeast of Wroclaw and. ABO Wind has secured a fixed feed-in tariff in a previous auction in 2019. ABO Wind has been active in Poland since 2019 and opened an office in Lodz earlier this year.