
The newbuild is of VARD 407 design which has been tailored to meet EnBW’s specific requirements. The vessel includes Voith Schneider eVSP propulsion and is prepared for the use of methanol as a fuel. The ship is also fully equipped with a height adjustable motion compensated gangway and 3D compensated crane. Scheduled to commence long-term charter with EnBW from the end of next year, the walk-to-work vessel will provide premier accommodation in field for up to 34 wind technicians as they maintain the development’s 64 wind turbines, located around 90km northwest of the island of Borkum and 110km west of Helgoland. The SOV will also act as a logistics hub and warehouse.