Palfinger and Yunneng Wind Power signed a contract to deliver 81 PF12000-4.6 LDB (lay-down boom) cranes for the Taiwanese wpd’s Yunlin Offshore Wind Farm.
wpd’s Yunlin Offshore Wind Farm consists of 80 turbines and has a project capacity of 640 MW. Each turbine platform will be equipped with one fixed boom crane, which has an outreach of 4.6 metres and a lifting capacity of 1 ton. Additionally, one crane will be installed onshore for training purposes.