Haewoori Offshore Wind 2 (500MW) and 3 (500MW), Copenhagen Infrastructure Partner’s (CIP) floating offshore wind projects off the coast of Ulsan, South Korea, have awarded a front-end engineering and design (FEED) contract to Aker Solutions and Principle Power for the floating foundations.
Aker Solutions will coordinate the design and delivery of the floating foundation structures required for the Haewoori Offshore Wind project and perform the front-end engineering design of the inter-array cable, marshalling port, wind turbine integration, transport, and installation. Principle Power will perform the design of the floating platforms and mooring system based on WindFloat technology. Aker Solutions will also carry out execution planning, and work with Haewoori Offshore Wind to engage with the Korean supply chain for local engagement in the projects.