The delivery involves an electric hydraulic box boom offshore Ram Luffing 2400 type designed and manufactured by KenzFigee. The crane will be designed and verified in accordance with the EN13852-1 and certified against DNVGL-ST-0378 lifting requirements. The expected delivery of the Ram Luffing offshore crane is scheduled for the second quarter in 2024.
KenzFigee wins contract award for crane delivery on the East Anglia Three HVDC converter station
- Category: Projects and Contracts