Denker & Wulf placed orders with the Nordex Group to supply and install 20 wind turbines for three projects in northern Germany. The orders also include service contracts for the maintenance of the turbines over a period of 15 years.
In Schleswig-Holstein, the 67.5 MW Gönnebek I+II wind farm is being built in the Segeberg district with a total of twelve turbines, eleven N149/5.X turbines and one N133/4.8. The Group will also supply one N149/5.X and one N163/6.X for the 12.7 MW Schönermark wind farm in the Uckermark district in Brandenburg. Denker & Wulf has further ordered six N163/6.X turbines for the 42 MW Oederquart-Wischhafen wind farm near Stade in Lower Saxony. Installations are scheduled to begin at the end of 2024.
The turbines will be equipped with technology, including Nordex' "BNK-Ready" solution for needs-based night-time marking and an ice detection system. In order to meet all requirements in terms of sound and shadow casting, as well as to take into account the extensive species protection, the turbines can be operated with different power modes and are equipped with shadow flicker and bat modules.