Friede & Goldman (F&G) (USA) and OIM Wind (Norway) have unveiled their new FO-146 Wind Turbine Installation Vessel (WTIV).
The WTIV can host either five sets of 18 MW or four sets of 20 MW Wind Turbine Generators (WTGs), each with their full height towers. It has the capability to operate in water depths of up to 80 meters. Additionally, it comes with a 3200 metric ton Safe Working Load (SWL) leg encircling crane, suitable for the installation of XXL foundations.