
The event, attended by local residents and construction personnel, celebrated the milestone achievement. The offshore wind farm is equipped with 14 Siemens Gamesa Renewable Energy wind power generators, each with a capacity of 8MW, resulting in a total output of 112MW. The offshore wind farm is developed by Green Power Investment Corporation (GPI), which is jointly owned by JERA and NTT Anode Energy Corporation (NTTAE).