
The vessel will serve as the permanent vessel in the contract with Siemens Gamesa Renewable Energy at the Saint-Brieuc wind farm in France, lasting until Q2 2028. The vessel has been prepared for zero-emission operations with hydrogen as an energy carrier in a Liquid Organic Hydrogen Carrier concept. C416 is of Salt 0358 design and can accommodate up to 60 persons in separate cabins.