
An E1000 gangway was fitted to OSCV Siem Barracuda in early December and within the next six months, a second Ampelmann gangway will begin its operations on the wind farm. Able to withstand waves up to 4.5m Hs, the gangway can be converted into a crane and has a lifting capacity of one tonne.